PLEASE NOTE: Lane closure schedules may change at any time without further notice. All projects are weather permitting.
-- HANA HIGHWAY (ROUTE 360) --
1) WAILUA VALLEY (24-HOUR WORK)
Lane closure on Hana Highway (Route 360) in the northbound direction in the vicinity of the Wailua Valley State Wayside on Saturday, Jan. 11, through Friday, Jan. 17, over a 24-hour period, for soil nail installation.
2) HAIKU (24-HOUR WORK)
Lane closure on Hana Highway (Route 360) in the northbound direction in the vicinity of Papaaea Road on Saturday, Jan. 11, through Friday, Jan. 17, over a 24-hour period, for retaining wall work.